Grimsel Lake road bridge, Guttannen

In the unique setting of the Grimsel region, a well-balanced relationship between cost and aesthetics—in the broader sense of the landscape—plays an important role. With its light, modern, transparent elegance, the bridge is intended to contrast with the sheer power of the landscape and the massiveness of the heavyweight dam, which was expanded in the old style.

The design developed by Prof. Dr. C. Menn proposes a cable-stayed bridge. In the high mountains, in view of the technical requirements for safety, durability and serviceability, the bridge concept must take into account not only the usual, standardized actions but, above all, extreme local loads from wind, snow and ice. The two 75 m-high pylons are located directly on the lakeshore and form the end points of the bridge, which spans 350 m. The bridge girder is formed by two concrete-filled steel hat sections as the main longitudinal girders and by prefabricated concrete deck elements. Every 8.25 m, the girder is supported by a pair of stay cables.

Details

Realisation

2020

Owner

Kraftwerke Oberhasli AG (KWO), Innertkirchen

Architect

Design: Christian Menn, Chur

Task

Design of the lake bridge within the engineering consortium Bänziger Partner, Dr. Deuring + Oehninger AG, Kissling+Zbinden. WaltGalmarini AG responsibilities: design of the bridge girder and stay cables. Resolving the dynamic and aerodynamic challenges.
This site is registered on wpml.org as a development site. Switch to a production site key to remove this banner.